Skip Ribbon Commands
Skip to main content

Health Sciences HS and MC

:

LB24-0417-23-A1-G1 HSHS Tenant Improvements/Structural Upgrades :Document TypesUse SHIFT+ENTER to open the menu (new window).Open MenuOpen Menu

Improvements to be completed include renovation of the third and fourth floors for additional classrooms which necessitate the addition of a four-story egress stair tower on the north side of the building;  upgrades to the existing structural system, including the foundations and steel framing, which will require patching and repair of areas affected. Additional improvements consist of fire and intrusion alarm systems, paint, floor coverings, ceilings, lighting and ADA signage.
  
  
  
  
collapse Document Types : Bid Documents ‎(3)
Bid Ad (2.20.24)_Health Sciences High GMP 1.pdf
  
7/2/2024 9:18 AMCruz Maria
Final Results_Health Sciences High GMP 1.pdf
  
7/2/2024 9:18 AMCruz Maria
Sub List_Health Sciences High GMP 1.pdf
  
7/2/2024 9:19 AMCruz Maria
collapse Document Types : Letters of Assent (LOA) & Pre-Job Forms (PJCF) ‎(1)
_GC Balfour Beatty_Health Sciences High GMP 1.pdf
  
7/2/2024 9:20 AMCruz Maria